Time for meditation... Slighly less than one year ago the massive reconstruction of the ground floor had just started: tons of dirt and debris still had to be taken out and disposed, the inner door was shorter and narrower, the new electric grid was still far even from being envisioned and now it's almost ready to be wired.
January 2024 |
January 2025 |
Long way to go still but a very long stretch has been taken already.
Giving really lots of thanks for what has been accomplished: the floor is ventilated now!
These are all the various layers installed in the two areas that have been completely dug out by hand (40 cm deep). Totally 47 square meters with the insulation layer (left) plus 18 square meters without the insulation (right), in a room that is going to be used as a storage cellar.
These are all the various layers installed in the two areas that have been completely dug out by hand (40 cm deep). Totally 47 square meters with the insulation layer (left) plus 18 square meters without the insulation (right), in a room that is going to be used as a storage cellar.
The various stages of intensive labor are simply summarized in the next drawing.
So much sweat have poured down to make every single step of all this!
So much sweat have poured down to make every single step of all this!