You are here now!
Pages
18 March 2025
16 January 2025
Evolution of the ground floor
| January 2024 |
| January 2025 |
07 January 2025
kitchen design detail
How to arrange efficiently wet cutlery on the only available corner of the counter.
From a sheet of paper to a sheet of aluminum.
24 April 2024
Healing a rotten wall
13 March 2024
More archeological findings
03 March 2024
Wood working with car-crank
While digging downstairs on the ground level, the cork and lime insulation at the first floor got nicely dried. No better chance to "take a rest" from digging than... laying the fir boards flooring on the first floor!!!
I have been using the same technique a few years ago, laying the floor in the room next door. Hopefully a short video-clip can explain the process of this handy trick... I am always pretty stoked of how efficient it is. It's always NOT easy to film and edit WHILE doing some physical labor...
Much respect for those who can arrange to do both things more proficiently than this!
25 February 2024
Setting a space column
It became a space column!!!
Check out all the details of the wood working construction process...
06 February 2024
Archeological findings
01 February 2024
Useful fishing
24 January 2024
Digging a new ground floor
Today I decided to approach another "challenging" task since it's involving besides a lot of physical labor also various delicate planning decisions: the insulation of the ground floor. The digging has started around the most tricky areas...
21 January 2024
Reducing demolition debris
When it comes to reducing the impact of a major demolition, it's quite hard to gain any positive effect. On a small manageable scale, hand-sifting debris allows to separate fine sand from gravel and bigger debris that eventually could end up being dumped or reused in a new construction.
The volume and the weight is reduced at least by half... which is a great result already!
13 January 2024
More cork
The process of laying down the cork insulation on this floor it's quite physical and tiring. Using correctly the leverages of the body is the most important task... so thankful that I can work squatting down instead of kneeling all the time!
This a time lapse sequence of a one day of work (doing just half of the surface).
Hold on tight and keep going on...
12 January 2024
Getting the right mix
Cork and lime floor insulation
Preparing for the flooring
04 January 2024
Cork and lime insulated floor
For this room I have planned to put a wooden floor with underneath an insulation layer made of cork and lime, both natural materials that inspire me a lot... I am really looking forward to try them out! The overall thickness is not going to be that much (due to the very low height of the window). Better than nothing anyway:
5 cm total = 1,8 cm of wooden boards + 3,2 cm of insulation
This is a short sequence showing the process of fixing the supports for the wooden floor.
03 January 2024
02 January 2024
New light in the new year
This is the ceiling of the new bathroom...
26 December 2023
Notching in hard wood
20 November 2023
A bath is born
Over a very (sadly) long stretch of time, broken into a myriad of short spare times and long phases of study and research over the chosen building materials and later at the details of the patterns... finally the first new bath for guests is taking shape.





