This job is expected to be pretty heavy and potentially messy... so minimizing the movements it's going to be very important, working in a tiny space that will have to stay as tidy as possible, clean and dry as well. Here are all the ingredients!
Sand
The required proportion from the italian eco-building store is:
1 cubic meter of cork, 350 kg of lime, sand (up to the needs).
Volume and weight... Is this going to be tricky?
In order to get a regular and even mix, I marked the required volumes on a plastic container. Hopefully this is going to be easy along the way, measuring each ingredient...
The required proportion from the italian eco-building store is:
1 cubic meter of cork, 350 kg of lime, sand (up to the needs).
Volume and weight... Is this going to be tricky?
In order to get a regular and even mix, I marked the required volumes on a plastic container. Hopefully this is going to be easy along the way, measuring each ingredient...
No comments:
Post a Comment